Most of renewable energy projects in the country are being implemented by the private sector developers selected through transparent bidding process. Government has issued standard bidding guidelines to enable the distribution licensees to procure power at competitive rates in cost effective manner. In order to be competitive, developers are encouraged to deploy most advanced technologies in these projects to tap maximum energy.
The state-wise and source-wise details of the projects implemented in various part of the country during last three years and current year are given in the Annexure-I.
The year-wise details of funds allocated and released in the form of central financial assistance for the implementation of various renewable energy programmes / schemes during last three years are given in Annexure-II.
Studies conducted by National Institute of Wind Energy (NIWE) with foreign assistance during last three years and current year are given in Annexure-III.
The steps taken by the Government to incentivize renewable energy sector in the country inter alia, include the following: –
- Announcement of a target of installing 175 GW of renewable energy capacity by the year, 2022; Permitting Foreign Direct Investment (FDI) up to 100 percent under the automatic route.
- Waiver of Inter State Transmission System (ISTS) charges and losses for inter-state sale of solar and wind power for projects to be commissioned up to December, 2022.
- Notification of standard bidding guidelines to enable distribution licensee to procure solar and wind power at competitive rates in cost effective manner.
- Declaration of trajectory for Renewable Purchase Obligation (RPO) up to the year 2022.
- Implementation of Green Energy Corridor project to facilitate grid integration of large scale renewable energy capacity addition.
- Launching of New Schemes, such as, PM-KUSUM, solar rooftop phase II, 12000 MW CPSU scheme Phase II.
This information was provided by Minister of State (IC) New & Renewable Energy, Power and Skill Development and Entrepreneurship Shri R.K. Singh, in written reply to a question in Lok Sabha on 5th December 2019.
Annexure-I
‘Renewable Energy Projects’
Source-wise and State-wise achievements made during the last three years and current year
(April 2016 to Oct 2019) (in MW) |
|||||||
S.No. | State/UT | Solar Power | Wind
Power
|
Small
Hydro Power |
Bio-
Power |
Waste to Energy | Total |
1 | Andhra Pradesh | 2743.86 | 2661.05 | 20 | 0 | 0 | 5424.91 |
2 | Arunachal Pradesh | 5.35 | 0 | 26.5 | 0 | 0 | 31.85 |
3 | Assam | 41.23 | 0 | 0 | 0 | 0 | 41.23 |
4 | Bihar | 144.25 | 0 | 0 | 9 | 0 | 153.25 |
5 | Chhattisgarh | 137.77 | 0 | 24 | 0 | 0 | 161.77 |
6 | Goa | 4.78 | 0 | 0 | 0 | 0 | 4.78 |
7 | Gujarat | 1558.65 | 3255.15 | 45.752 | 12 | 0 | 4871.552 |
8 | Haryana | 220.13 | 0 | 0 | 26.2 | 0 | 246.33 |
9 | Himachal Pradesh | 29.43 | 0 | 112.7 | 0 | 0 | 142.13 |
10 | Jammu & Kashmir | 18.13 | 0 | 23.5 | 0 | 0 | 41.63 |
11 | Jharkhand | 22.2 | 0 | 0 | 0 | 0 | 22.2 |
12 | Karnataka | 6350.9 | 1884.3 | 39 | 409.6 | 0 | 8683.8 |
13 | Kerala | 128.06 | 19 | 23.1 | 0 | 0 | 170.16 |
14 | Madhya Pradesh | 1339.71 | 378.8 | 9.75 | 0 | 11.5 | 1739.76 |
15 | Maharashtra | 1266.32 | 140.35 | 39.7 | 532.7 | 0 | 1979.07 |
16 | Manipur | 4.3 | 0 | 0 | 0 | 0 | 4.3 |
17 | Meghalaya | 0.12 | 0 | 1.5 | 0 | 0 | 1.62 |
18 | Mizoram | 1.32 | 0 | 5 | 0 | 0 | 6.32 |
19 | Nagaland | 1 | 0 | 0 | 0 | 0 | 1 |
20 | Orissa | 330.36 | 0 | 0 | 0 | 0 | 330.36 |
21 | Punjab | 534.52 | 0 | 2.65 | 21 | 1.5 | 559.67 |
22 | Rajasthan | 3466.35 | 305.7 | 0 | 4.95 | 0 | 3777 |
23 | Sikkim | 0.07 | 0 | 0 | 0 | 0 | 0.07 |
24 | Tamil Nadu | 2033.06 | 1617.875 | 0 | 95.5 | 0 | 3746.435 |
25 | Telangana | 3092.9 | 50.4 | 0 | 0 | 0 | 3143.3 |
26 | Tripura | 4.41 | 0 | 0 | 0 | 0 | 4.41 |
27 | Uttar Pradesh | 901.06 | 0 | 0 | 24.5 | 0 | 925.56 |
28 | Uttarakhand | 272.05 | 0 | 0 | 0 | 0 | 272.05 |
29 | West Bengal | 100.6 | 0 | 0 | 0 | 0 | 100.6 |
30 | Andaman & Nicobar | 7.09 | 0 | 0 | 0 | 0 | 7.09 |
31 | Chandigarh | 30.19 | 0 | 0 | 0 | 0 | 30.19 |
32 | Dadar & Nagar Haveli | 5.46 | 0 | 0 | 0 | 0 | 5.46 |
33 | Daman & Diu | 12.02 | 0 | 0 | 0 | 0 | 12.02 |
34 | Delhi | 122.63 | 0 | 0 | 0 | 36 | 158.63 |
35 | Lakshadweep | 0 | 0 | 0 | 0 | 0 | 0 |
36 | Pondicherry | 3.17 | 0 | 0 | 0 | 0 | 3.17 |
37 | Others | 0 | 0 | 0 | 0 | 0 | 0 |
Total | 24933.45 | 10312.63 | 373.15 | 1135.45 | 49 | 36803.68 |
Annexure-II
‘Renewable Energy Projects’
Details of funds allocated and released in the form of Central Financial Assistance for the implementation of various renewable energy programmes / schemes during last three years
Year 2016-17 | ||||||||||
(` in crores) | ||||||||||
Sl.
No. |
Detail of Minor Head | Head of Account | BE | RE | NER | RE +NER | Total
20162017 |
|||
Plan | Non-
Plan |
Plan | Non-
Plan |
Plan | Non-
Plan |
|||||
1 | 101-Grid
Interactive and Distributed Renewable Power |
01-Grid Interactive Renewable Power | ||||||||
Wind Power | 365.00 | . | 488.95 | 488.95 | 488.95 | |||||
Hydro Power-OAE | 0.50 | 0.50 | 0.50 | 0.50 | ||||||
Hydro power-GIA | 4.40 | 4.40 | 4.40 | 4.40 | ||||||
Hydro power-subsidy | 80.00 | 80.00 | 26.67 | 106.67 | 107.01 | |||||
Hydro power-GCCA | 0.10 | 0.10 | 0.10 | 0.10 | ||||||
Bio Power | 30.00 | 17.00 | 17.00 | 16.29 | ||||||
Solar Power | 90.00 | 35.00 | 35.00 | 22.15 | ||||||
Solar Power-GCCA | 2048.00 | 1969.50 | 15.52 | 1985.02 | 1970.17 | |||||
Green Energy Corridors | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
Green Energy-GCCA | 500.00 | 200.00 | 200.00 | 200.00 | ||||||
Advertising and publicity | 4.00 | 13.10 | 13.10 | 11.38 | ||||||
GIA | 1.00 | 2.00 | 2.00 | 1.32 | ||||||
DREA-GIA | 2.00 | 2.00 | 2.00 | 1.96 | ||||||
Energy Storage-OAE | 0.10 | 0.10 | 0.10 | 0.00 | ||||||
Energy Storage- GIA | 2.90 | 0.00 | 0.00 | 0.00 | 0.00 | |||||
Energy Storage-GCCA | 13.00 | 0.00 | 0.00 | 0.00 | ||||||
Externally Aided Projects-
OAE |
1.15 | 1.15 | 1.15 | 0.00 | ||||||
professional Services | 0.50 | 0.50 | 0.50 | 0.00 | ||||||
Externally Aided Projects-GIA | 37.30 | 37.30 | 37.30 | 0.00 | ||||||
Other Charges | 0.05 | 0.05 | 0.05 | 0.00 | ||||||
3180.00 | 0.00 | 2851.65 | 0.00 | 42.19 | 2893.84 | 0.00 | 2824.23 | |||
02-Off-Grid/Distributed and
Decentralized Renewable Power |
||||||||||
Wind Power-GIA | 0.10 | 0.10 | 0.10 | 0.00 | ||||||
Wind Power-Subsidy | 5.00 | 4.00 | 4.00 | 2.38 | ||||||
Wind Power-GCCA | 0.10 | 0.10 | 0.10 | 0.00 | ||||||
Hydro Power-GIA | 9.00 | 9.00 | 9.00 | 8.99 | ||||||
Hydro power-GCCA | 1.00 | 1.00 | 1.00 | 1.00 | ||||||
Bio Power-GIA | 0.50 | 0.50 | 0.50 | 0.36 | ||||||
Bio Power-GCCA | 29.50 | 25.50 | 25.50 | 14.32 | ||||||
Solar Power-OAE | 1.00 | 1.00 | 1.00 | 0.14 | ||||||
professional Services | 1.00 | 1.00 | 1.00 | 1.01 | ||||||
Solar power-GIA | 9.00 | 9.00 | 9.00 | 8.37 | ||||||
Solar power-Subs | 15.00 | 10.00 | 10.00 | 8.79 | ||||||
Solar Power-GCCA | 267.00 | 267.00 | 112.78 | 379.78 | 367.03 | |||||
RVE-GIA | 1.00 | 1.00 | 1.00 | 1.00 | ||||||
RVE-GCCA | 6.00 | 6.00 | 6.00 | 9.18 | ||||||
Biogas Programme-OAE | 0.50 | 0.50 | 0.50 | 0.08 | ||||||
Professional Services | 0.50 | 0.50 | 0.50 | 0.09 | ||||||
Biogas Programme-GIA | 11.75 | 16.75 | 0.00 | 16.75 | 15.98 | |||||
Biogas Programme-GCCA | 42.25 | 47.25 | 6.03 | 53.28 | 48.37 | |||||
Other Including cookstoves-
GIA |
6.00 | 6.00 | 6.00 | 0.00 | ||||||
Subsidy | 2.00 | 1.50 | 1.50 | 0.55 | ||||||
OREA-GIA | 0.10 | 0.00 | 0.00 | 0.00 |
OREA-OAE | 14.70 | 4.80 | 4.80 | 4.25 | ||||||
Externally Aided Projects-
OAE |
0.85 | 0.85 | 0.85 | 0.85 | ||||||
Professional Services | 2.00 | 2.00 | 2.00 | 1.95 | ||||||
GIA | 3.00 | 3.00 | 3.00 | 3.00 | ||||||
Other Charges | 0.15 | 0.15 | 0.15 | 0.15 | ||||||
Energy Storage -GIA | 2.00 | 0.00 | 0.00 | 0.00 | ||||||
431.00 | 0.00 | 418.50 | 0.00 | 118.81 | 537.31 | 0.00 | 497.84 | |||
Total-Grid Interactive and Distributed Renewable Power | 3611.00 | 0.00 | 3270.15 | 0.00 | 161.00 | 3431.15 | 0.00 | 3322.07 | ||
2 | North Eastern Areas (Major Head) | |||||||||
Hydro Power – Subsidy | 27.00 | 27.00 | -26.67 | 0.33 | 0.00 | |||||
Solar Power-GCCA | 212.00 | 212.00 | -15.52 | 196.48 | 0.00 | |||||
239.00 | 0.00 | 239.00 | 0.00 | -42.19 | 196.81 | 0.00 | 0.00 | |||
Solar Power – GCCA | 200.00 | 134.20 | –
112.78 |
21.42 | 0.00 | |||||
Wind Power -GIA | 0.30 | 0.30 | 0.30 | 0.00 | ||||||
Wind Power-GCCA | 1.50 | 1.50 | 1.50 | 0.00 | ||||||
Remote Village
Electrification(RVE)-GIA |
1.00 | 1.00 | 1.00 | 0.00 | ||||||
RVE -GCCA | 19.00 | 19.00 | 19.00 | 0.00 | ||||||
Biogas Programme-GIA | 1.00 | 1.00 | -0.28 | 0.72 | 0.00 | |||||
Biogas Programme -GCCA | 26.00 | 14.00 | -8.55 | 5.45 | 0.00 | |||||
Other including cook stoves-
GIA |
3.00 | 3.00 | 3.00 | 0.00 | ||||||
OtherRenewable Energy Application-GIA | 5.20 | 0.00 | 0.00 | 0.00 | ||||||
257.00 | 0.00 | 174.00 | 0.00 | –
121.61 |
52.39 | 0.00 | 0.00 | |||
496.00 | 0.00 | 413.00 | 0.00 | –
163.80 |
249.20 | 0.00 | 0.00 | |||
3 | GIA to State Government (Major Head) | |||||||||
Biogas Programme – GIA | 5.00 | 0.00 | 0.00 | 0.00 | ||||||
Biogas Programme-GCCA | 35.00 | 0.00 | 0.00 | 0.00 | ||||||
Biogas Programme – GIA | 1.50 | 0.00 | 0.00 | 0.00 | ||||||
Biogas Programme – GCCA | 3.50 | 0.00 | 0.00 | 0.00 | ||||||
45.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||
4 | 104-
Research, Design and Development in RE |
04-Research development and international corporation (Sub-Head) | ||||||||
Bio-Energy-OAE | 0.20 | 0.20 | 0.20 | 0.00 | ||||||
Bio Energy- GIA | 2.30 | 2.30 | 2.30 | 1.60 | ||||||
Bio Energy- GCCA | 5.50 | 4.50 | 4.50 | 2.66 | ||||||
Solar Energy-GIA | 54.00 | 35.00 | 35.00 | 27.25 | ||||||
Solar Energy-GCCA | 36.00 | 25.00 | 25.00 | 22.21 | ||||||
Small Hydro Power-GIA | 2.00 | 2.00 | 2.00 | 1.70 | ||||||
Small Hydro Power-GCCA | 1.00 | 1.00 | 1.00 | 1.00 | ||||||
New Technologies-OAE | 0.10 | 0.10 | 0.10 | 0.04 | ||||||
GIA | 10.00 | 2.90 | 2.90 | 1.83 | ||||||
New Technologies-GIA | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
New Technologies GCCA | 9.90 | 12.25 | 12.25 | 1.76 | ||||||
Wind Energy-GIA | 1.20 | 0.70 | 0.70 | 0.23 | ||||||
Wind Energy-GCCA | 1.80 | 1.30 | 1.30 | 0.53 | ||||||
International Relations-OAE | 1.00 | 1.00 | 1.00 | 0.01 | ||||||
International Relations-GIA | 219.00 | 129.00 | 129.00 | 121.68 | ||||||
International RelationsContributions | 1.60 | 1.60 | 1.60 | 0.00 | ||||||
HRD and Training-OAE | 0.20 | 0.20 | 0.20 | 0.16 | ||||||
HRD and Training-GIA | 35.00 | 39.20 | 39.20 | 39.20 | ||||||
HRD and Training-
Scholarship/stipend |
10.00 | 3.50 | 3.50 | 2.78 | ||||||
HRD and Training-GCCA | 4.80 | 0.60 | 0.60 | 0.60 |
Energy Storage – OAE | 0.10 | 0.10 | 0.10 | 0.00 | ||||||
Energy Storage – GIA | 0.50 | 0.00 | 0.00 | 0.00 | ||||||
Energy Storage – GCCA | 1.40 | 0.00 | 0.00 | 0.00 | ||||||
New & Innovative ProjectsGIA | 35.00 | 9.00 | 9.00 | 0.00 | ||||||
New and Innovative Projects-
GCCA |
9.00 | 3.00 | 3.00 | 0.00 | ||||||
440.00 | 1.60 | 272.85 | 1.60 | 0.00 | 272.85 | 1.60 | 225.24 | |||
05 Autonomous Bodies | ||||||||||
National Institute of Wind
Energy-GIA |
9.00 | 9.00 | 9.00 | 9.00 | ||||||
National Institute of Wind
Energy-GCCA |
16.00 | 16.00 | 16.00 | 16.00 | ||||||
National Institute of Bio
Energy-GIA |
5.00 | 1.00 | 1.00 | 0.00 | ||||||
National Institute of Bio
Energy-GCCA |
2.00 | 1.00 | 1.00 | 0.00 | ||||||
National Institute of Bio Energy -GIA-Salary | 1.00 | 1.00 | 1.00 | 0.00 | ||||||
National Institute of Solar
Energy -GIA |
6.00 | 1.00 | 1.00 | 1.00 | ||||||
National Institute of Solar
Energy -GCCA |
10.50 | 2.50 | 2.50 | 2.50 | ||||||
National Institute of Solar Energy -GIA-salaries | 3.50 | 3.50 | 3.50 | 3.50 | ||||||
53.00 | 0.00 | 35.00 | 0.00 | 0.00 | 35.00 | 0.00 | 32.00 | |||
493.00 | 1.60 | 307.85 | 1.60 | 0.00 | 307.85 | 1.60 | 257.24 | |||
5 | 789 Special component Plan for Scheduled Castes | |||||||||
Solar Power – GIA | 3.00 | 3.00 | 3.00 | 1.04 | ||||||
Solar Power – GCCA | 134.00 | 110.00 | 110.00 | 109.72 | ||||||
Remote Village
Electrification(RVE)-GCCA |
13.00 | 13.00 | 13.00 | 4.31 | ||||||
Biogas Programme -GIA | 3.00 | 4.50 | 0.28 | 4.78 | 2.42 | |||||
Biogas Programme-GCCA | 7.00 | 10.50 | 0.27 | 10.77 | 5.01 | |||||
Other including cook stoves-
GIA |
3.00 | 3.00 | 3.00 | 0.00 | ||||||
Research Development &
International CorporationGIA |
5.00 | 0.00 | 0.00 | 0.00 | ||||||
168.00 | 0.00 | 144.00 | 0.00 | 0.55 | 144.55 | 0.00 | 122.50 | |||
796 Tribal Area Sub Plan
(Minor Head) Off-Grid / Distributed and Decentralized Renewable power(Sub Head |
||||||||||
Solar power-GIA | 1.00 | 1.00 | 1.00 | 0.07 | ||||||
Solar Power-GCCA | 69.00 | 54.00 | 54.00 | 52.64 | ||||||
Remote Village
Electrification (RVE)-GIA |
1.00 | 1.00 | 1.00 | 1.00 | ||||||
Remote village Electrification-
GCCA |
9.00 | 9.00 | 9.00 | 8.64 | ||||||
Biogas Programme-GCCA | 5.00 | 5.00 | 2.25 | 7.25 | 7.16 | |||||
Other Including cookstoves-
GIA |
2.00 | 2.00 | 2.00 | 0.00 | ||||||
87.00 | 0.00 | 72.00 | 0.00 | 2.25 | 74.25 | 0.00 | 69.51 | |||
255.00 | 0.00 | 216.00 | 0.00 | 2.80 | 218.80 | 0.00 | 192.01 | |||
0.00 | ||||||||||
6 | 190- Investment in Public Sector and Other Undertakings | Solar Energy Corporation of India – Investments | 100.00 | 100.00 | 100.00 | 100.00 | ||||
0.00 | 0.00 | 15.00 | 0.00 | 15.00 | 10.61 | |||||
100.00 | 0.00 | 100.00 | 15.00 | 0.00 | 100.00 | 15.00 | 110.61 | |||
0.00 | ||||||||||
GRAND TOTAL (PLAN) | 5000.00 | 1.60 | 4307.00 | 16.60 | 0.00 | 4307.00 | 16.60 | 3881.93 | ||
Deduct Recovery | 0.00 | |||||||||
Net Plan | 5000.00 | 1.60 | 4307.00 | 16.60 | 0.00 | 4307.00 | 16.60 | 3881.93 | ||
7 | Secretariat
(NON-PLAN) |
Eco Services (NON-PLAN) | 0.00 | 34.19 | 0.00 | 36.53 | 0.00 | 36.53 | 34.43 | |
Grand Total | 5000.00 | 35.79 | 4307.00 | 53.13 | 0.00 | 4307.00 | 53.13 | 3916.36 |
Year 2017-18 | ||||||||
Sl.
No. |
Detail of
Minor Head |
Head of Account | BE | RE | Reappropria
tion |
RE+NER | Total 2017-18 | |
Plan | ||||||||
1 | 101-Grid
Interactive and Distributed Renewable Power |
01-Grid Interactive Renewable
Power |
||||||
Wind Power | 400.00 | 750.00 | 0.00 | 750.00 | 750.00 | |||
Hydro Power-OAE | 0.50 | 0.22 | 0.22 | 0.22 | ||||
Hydro power-GIA | 5.00 | 2.00 | 2.00 | 2.04 | ||||
Hydro power-subsidy | 75.00 | 62.78 | 28.99 | 91.77 | 102.78 | |||
Bio Power | 33.00 | 21.50 | 21.50 | 13.29 | ||||
Solar Power | 98.00 | 6.00 | 6.00 | 5.31 | ||||
Solar Power-GCCA | 2161.00 | 950.10 | 20.02 | 970.12 | 970.02 | |||
Green Energy-GCCA | 500.00 | 500.00 | 500.00 | 499.98 | ||||
Externally Aided Projects-OAE | 1.15 | 0.10 | 0.10 | 0.10 | ||||
professional Services | 0.50 | 0.10 | 0.10 | 0.10 | ||||
Externally Aided Projects-GIA | 37.30 | 0.20 | 0.20 | 0.20 | ||||
Other Charges | 0.05 | 0.10 | 0.10 | 0.05 | ||||
interest payments bonds | 280.00 | 128.00 | 128.00 | 126.45 | ||||
3591.50 | 2421.10 | 49.01 | 2470.11 | 2470.54 | ||||
02-Off-Grid/Distributed and
Decentralized Renewable Power |
||||||||
Wind Power-GIA | 0.25 | 0.15 | 0.15 | 0.14 | ||||
Wind Power-Subsidy | 5.50 | 4.25 | 4.25 | 4.25 | ||||
Wind Power-GCCA | 0.25 | 0.00 | 0.00 | 0.00 | ||||
Hydro Power-GIA | 11.90 | 6.00 | 6.00 | 6.39 | ||||
Hydro power-GCCA | 1.10 | 0.00 | 0.00 | 0.00 | ||||
Bio Power-GIA | 0.50 | 0.50 | 0.50 | 0.27 | ||||
Bio Power-GCCA | 42.50 | 19.50 | 19.50 | 12.95 | ||||
Solar Power-OAE | 1.00 | 1.00 | 1.00 | 0.63 | ||||
professional Services | 1.00 | 1.00 | 1.00 | 0.95 | ||||
Solar power-GIA | 8.00 | 2.00 | 2.00 | 1.99 | ||||
Solar power-Subs | 15.00 | 12.00 | 12.00 | 11.77 | ||||
Solar Power-GCCA | 407.00 | 614.00 | 84.79 | 698.79 | 710.22 | |||
Biogas Programme-GIA | 11.00 | 11.00 | 11.00 | 8.46 | ||||
Biogas Programme-GCCA | 35.00 | 38.50 | 3.41 | 41.91 | 46.66 | |||
OREA-GIA | 0.20 | 0.20 | 0.20 | 0.00 | ||||
OREA-OAE | 13.50 | 4.30 | 4.30 | 3.78 | ||||
GIA-SUBSIDY | 0.50 | 0.50 | 0.50 | 0.00 | ||||
Externally Aided Projects-OAE | 0.85 | 0.85 | 0.85 | 0.85 | ||||
Professional Services | 2.00 | 2.00 | 2.00 | 1.97 | ||||
GIA | 3.00 | 3.00 | 3.00 | 3.00 | ||||
Other Charges | 0.15 | 0.15 | 0.15 | 0.15 | ||||
560.20 | 720.90 | 88.20 | 809.10 | 814.43 | ||||
Total-Grid Interactive and Distributed Renewable Power | 4151.70 | 3142.00 | 137.21 | 3279.21 | 3284.97 | |||
2 | North Eastern Areas (Major Head) | |||||||
Hydro Power – Subsidy | 29.00 | 40.00 | -28.99 | 11.01 | 0.00 | |||
Solar Power-GCCA | 360.00 | 134.00 | -20.02 | 113.98 | 0.00 | |||
389.00 | 174.00 | -49.01 | 124.99 | 0.00 | ||||
Solar Power – GCCA | 100.00 | 190.00 | -84.79 | 105.21 | 0.00 | |||
Wind Power -GIA | 0.60 | 0.10 | 0.10 | 0.00 | ||||
Wind Power-GCCA | 1.40 | 0.40 | 0.40 | 0.00 | ||||
Biogas Programme-GIA | 4.00 | 2.00 | 2.00 | 0.00 | ||||
Biogas Programme -GCCA | 30.00 | 27.50 | -3.41 | 24.09 | 0.00 | ||
136.00 | 220.00 | -88.20 | 131.80 | 0.00 | |||
525.00 | 394.00 | -137.21 | 256.79 | 0.00 | |||
05 Autonomous Bodies | |||||||
National Institute of Wind
Energy-GIA |
9.00 | 7.00 | 7.00 | 7.00 | |||
National Institute of Wind
Energy-GCCA |
16.00 | 16.00 | 16.00 | 16.00 | |||
National Institute of Bio
Energy-GIA |
5.00 | 0.50 | 0.50 | 0.50 | |||
National Institute of Bio
Energy-GCCA |
2.00 | 0.50 | 0.50 | 0.50 | |||
National Institute of Bio Energy -GIA-Salary | 1.00 | 1.00 | 1.00 | 0.00 | |||
National Institute of Solar
Energy -GIA |
6.00 | 6.00 | 6.00 | 6.00 | |||
National Institute of Solar
Energy -GCCA |
10.50 | 10.50 | 10.50 | 5.82 | |||
National Institute of Solar Energy -GIA-salaries | 3.50 | 3.50 | 3.50 | 2.82 | |||
R&D ACTIVITIES-OAE | 0.55 | 0.55 | 0.55 | 0.05 | |||
R&D ACTIVITIES-GIA | 78.90 | 35.45 | 35.45 | 29.79 | |||
GCCA | 64.55 | 45.00 | 45.00 | 43.08 | |||
197.00 | 126.00 | 0.00 | 126.00 | 111.56 | |||
SUPPORTING
PROGRAMMES (SUB HEAD)-OAE |
0.10 | 0.00 | 0.00 | 0.00 | |||
Professional services | 13.00 | 0.00 | 0.00 | 0.00 | |||
GIA | 1.90 | 0.00 | 0.00 | 0.00 | |||
e-governance supply &materials | 0.09 | 0.09 | 0.09 | 0.06 | |||
GIA | 0.01 | 0.01 | 0.01 | 0.00 | |||
Information education advertising & publicity | 13.00 | 13.00 | 13.00 | 13.00 | |||
GIA | 7.00 | 2.00 | 2.00 | 0.67 | |||
International Relations-
OAE |
2.00 | 0.50 | 0.50 | 0.12 | |||
Int.Relations-GIA | 73.00 | 19.50 | 19.50 | 15.37 | |||
Contributions | 1.60 | 1.60 | 1.60 | 1.13 | |||
HRD&Training-OAE | 0.20 | 0.20 | 0.20 | 0.19 | |||
GIA | 55.00 | 55.00 | 55.00 | 40.12 | |||
Scholarship | 10.00 | 10.00 | 10.00 | 3.12 | |||
GCCA | 4.80 | 4.80 | 4.80 | 0.00 | |||
New & Innovative ProjectsGIA | 12.00 | 3.00 | 3.00 | 0.00 | |||
2.90 | 1.90 | 1.90 | 0.00 | ||||
196.60 | 111.60 | 0.00 | 111.60 | 73.78 | |||
393.60 | 237.60 | 0.00 | 237.60 | 185.34 | |||
5 | 789 Special component Plan for Scheduled Castes | ||||||
Solar Power – GIA | 3.00 | 1.00 | 1.00 | 0.03 | |||
Solar Power – GCCA | 135.00 | 135.00 | 135.00 | 134.92 | |||
Biogas Programme -GIA | 10.00 | 3.00 | 3.00 | 1.54 | |||
Biogas Programme-GCCA | 36.00 | 4.00 | 4.00 | 3.05 | |||
184.00 | 143.00 | 0.00 | 143.00 | 139.54 | |||
796 Tribal Area Sub Plan
(Minor Head) OffGrid/Distributed and Decentralized Renewable power(Sub Head |
|||||||
Solar power-GIA | 2.00 | 1.00 | 1.00 | 0.09 | |||
Solar Power-GCCA | 28.00 | 28.00 | 28.00 | 28.00 | |||
Biogas Programme-GCCA | 8.00 | 8.00 | 8.00 | 7.99 | |||
GRID Interactive Renewable power(hydro power)-subsidy | 12.00 | 9.00 | 9.00 | 8.98 | |||
Solar power-GIA | 2.00 | 1.00 | 1.00 | 0.00 | |||
Solar power-GCCA | 40.00 | 26.00 | 26.00 | 26.00 | |||
92.00 | 73.00 | 0.00 | 73.00 | 71.06 | |||
276.00 | 216.00 | 0.00 | 216.00 | 210.60 | |||
6 | 190- Investment in Public Sector and Other Undertakings | Solar Energy Corporation of India – Investments | 50.00 | 50.00 | 50.00 | 50.00 | |
Office Building | 40.00 | 1.00 | 1.00 | 1.00 | |||
90.00 | 51.00 | 0.00 | 51.00 | 51.00 | |||
GRAND TOTAL (PLAN) | 5436.30 | 4040.60 | 0.00 | 4040.60 | 3731.91 | ||
Deduct Recovery | |||||||
Net Plan | 5436.30 | 4040.60 | 0.00 | 4040.60 | 3731.91 | ||
7 | Secretariat
(NON-PLAN) |
Eco Services (NON-PLAN) | 36.54 | 39.40 | 0.00 | 39.40 | 36.82 |
GRAND TOTAL | 5472.84 | 4080.00 | 0.00 | 4080.00 | 3768.73 |
Year 2018-1 | 9 | ||||||
Sl.
No. |
Detail of Minor Head | Head of Account | BE | RE | RE-
APPROPRI ATION |
Total (RE
+ reappro) |
Total 2018-19 |
Plan | |||||||
1 | 101-Grid
Interactive and Distributed Renewable Power |
01-Grid Interactive Renewable Power | |||||
Wind Power-subsidy | 750.00 | 950.00 | 950.00 | 950.00 | |||
Hydro Power-OAE | 0.50 | 0.30 | 0.30 | 0.29 | |||
Hydro power-GIA | 4.50 | 2.50 | 2.50 | 0.03 | |||
Hydro power-subsidy | 52.00 | 62.90 | 14.53 | 77.43 | 76.43 | ||
Bio Power | 25.00 | 8.50 | 8.50 | 6.83 | |||
Solar Power | 25.24 | 7.24 | 7.24 | 7.24 | |||
Solar Power-GCCA | 1784.00 | 1834.00 | 1834.00 | 1834.51 | |||
Green Energy-GCCA | 600.00 | 500.00 | 500.00 | 500.00 | |||
Energy Storage-OAE | 0.01 | 0.00 | 0.00 | ||||
Externally Aided Projects-
OAE |
0.75 | 0.75 | 0.75 | 0.00 | |||
professional Services | 0.40 | 0.40 | 0.40 | 0.00 | |||
Externally Aided Projects-
GIA |
6.00 | 6.00 | 6.00 | 0.00 | |||
Other Charges | 0.10 | 0.10 | 0.10 | 0.00 | |||
interest payments bonds-GIA | 128.00 | 124.45 | 124.45 | 124.38 | |||
3376.50 | 3497.14 | 14.53 | 3511.67 | 3499.71 | |||
02-Off-Grid/Distributed and
Decentralized Renewable Power |
|||||||
Wind Power-GIA | 0.21 | 0.25 | 0.25 | 0.25 | |||
Wind Power-Subsidy | 5.00 | 2.23 | 2.23 | 1.34 | |||
Wind Power-GCCA | 0.22 | 0.00 | 0.00 | 0.00 | |||
Hydro Power-GIA | 1.00 | 0.30 | 0.30 | 0.30 | |||
Hydro Power-subsidy | 10.00 | 2.00 | 2.00 | 0.62 | |||
Hydro power-GCCA | 0.50 | 0.50 | 0.50 | 0.00 | |||
Bio Power-GIA | 1.00 | 1.00 | 1.00 | 0.10 | |||
Bio Power-GCCA | 22.00 | 38.50 | 38.50 | 3.24 | |||
Solar Power-OAE | 1.00 | 1.00 | 1.00 | 0.00 | |||
professional Services | 1.00 | 1.00 | 1.00 | 0.37 | |||
Solar power-GIA | 4.00 | 4.00 | 4.00 | 2.53 | |||
Solar power-Subs | 8.00 | 8.00 | 8.00 | 7.06 | |||
Solar Power-GCCA | 370.00 | 370.00 | 67.93 | 437.93 | 433.47 | ||
Biogas Programme-GIA | 11.00 | 6.00 | 1.65 | 7.65 | 6.07 | ||
Biogas Programme-GCCA | 38.00 | 30.00 | 1.12 | 31.12 | 25.93 | ||
OREA-GIA | 0.20 | 0.20 | 0.20 | 0.00 | |||
OREA-OAE | 10.50 | 2.50 | 2.50 | 0.11 | |||
GIA-SUBSIDY | 0.30 | 0.00 | 0.00 | 0.00 | |||
Energy Storage-GCCA | 0.01 | 0.00 | 0.00 | 0.00 | |||
Energy Storage-OAE | 0.01 | 0.00 | 0.00 | 0.00 | |||
483.95 | 467.48 | 70.70 | 538.18 | 481.39 |
Total-Grid Interactive and Distributed Renewable Power | 3860.45 | 3964.62 | 85.23 | 4049.85 | 3981.10 | ||
2 | North Eastern Areas (Major Head) | ||||||
Hydro Power – Subsidy | 90.00 | 90.00 | -14.53 | 75.47 | 0.00 | ||
Solar Power-GCCA | 172.50 | 252.50 | 252.50 | 0.00 | |||
262.50 | 342.50 | 327.97 | 0.00 | ||||
Solar Power – GCCA | 220.00 | 140.00 | -67.93 | 72.07 | 0.00 | ||
Wind Power -GIA | 0.60 | 0.60 | 0.60 | 0.00 | |||
Wind Power-GCCA | 1.40 | 1.40 | 1.40 | 0.00 | |||
Wind Power-GIA | 0.01 | 0.01 | 0.01 | ||||
Biogas Programme-GIA | 5.00 | 5.00 | -1.65 | 3.35 | 0.00 | ||
Biogas Programme -GCCA | 15.00 | 15.00 | -1.12 | 13.88 | 0.00 | ||
OIK-GIA | 0.01 | 0.01 | 0.01 | ||||
OREA-GIA | 0.01 | 0.01 | 0.01 | ||||
242.03 | 162.03 | -85.23 | 91.33 | 0.00 | |||
504.53 | 504.53 | -85.23 | 419.30 | 0.00 | |||
05 Autonomous Bodies | |||||||
Energy Storage-OAE | 0.01 | 0.00 | 0.00 | 0.00 | |||
New & Innovative Projects-GIA | 0.01 | 0.00 | 0.00 | 0.00 | |||
National Institute of Wind
Energy-GIA |
5.00 | 0.00 | 0.00 | 0.00 | |||
National Institute of Wind Energy-
GCCA |
15.00 | 0.00 | 0.00 | 0.00 | |||
National Institute of Bio Energy-
GIA |
1.00 | 1.00 | 1.00 | 0.00 | |||
National Institute of Bio Energy-
GCCA |
1.00 | 1.00 | 1.00 | 0.00 | |||
National Institute of Bio Energy GIA-Salary | 1.00 | 1.00 | 1.00 | 1.00 | |||
National Institute of Solar
Energy -GIA |
5.00 | 5.00 | 5.00 | 5.00 | |||
National Institute of Solar Energy
-GCCA |
9.50 | 9.50 | 9.50 | 9.50 | |||
National Institute of Solar Energy -GIA-salaries | 3.50 | 3.50 | 3.50 | 3.50 | |||
R&D ACTIVITIES-OAE | 0.55 | 0.25 | 0.25 | 0.01 | |||
R&D ACTIVITIES-GIA | 48.90 | 29.45 | -0.85 | 28.60 | 12.93 | ||
GCCA | 44.55 | 13.30 | 13.30 | 12.50 | |||
135.02 | 64.00 | -0.85 | 63.15 | 44.44 | |||
SUPPORTING
PROGRAMMES (SUB HEAD)OAE |
0.10 | 0.03 | 0.03 | 0.00 | |||
Professional services | 0.10 | 0.10 | 0.10 | 0.07 | |||
GIA | 0.10 | 0.02 | 0.02 | 0.00 | |||
e-governance supply &materials | 0.09 | 0.25 | 0.25 | 0.11 | |||
GIA | 0.01 | 0.00 | 0.00 | 0.00 | |||
Information education advertising & publicity | 13.00 | 9.00 | 9.00 | 3.78 | |||
GIA | 2.00 | 1.00 | 1.00 | 0.08 | |||
Int.Relations-GIA | 55.00 | 25.00 | 25.00 | 22.87 | |||
Contributions | 1.60 | 1.60 | 1.60 | 1.20 | |||
HRD&Training-OAE | 0.20 | 0.20 | 0.20 | 0.08 | |||
GIA | 49.00 | 56.80 | 56.80 | 56.14 | |||
Scholarship | 6.00 | 1.50 | 1.50 | 1.16 | |||
GCCA | 4.80 | 1.50 | 1.50 | 0.00 | |||
New & Innovative Projects-GIA | 0.10 | 0.01 | 0.01 | 0.00 | |||
0.10 | 0.01 | 0.01 | 0.00 | ||||
132.20 | 97.02 | 97.02 | 85.49 | ||||
267.22 | 161.02 | -0.85 | 160.17 | 129.93 | |||
5 | 789 Special component Plan for
Scheduled Castes |
||||||
Solar Power – GIA | 2.00 | 2.00 | 2.00 | 0.14 | |||
Solar Power – GCCA | 175.00 | 203.00 | 203.00 | 115.55 | |||
Biogas Programme -GIA | 17.00 | 5.00 | 5.00 | 1.64 | |||
Biogas Programme-GCCA | 23.00 | 7.00 | 7.00 | 4.67 | |||
217.00 | 217.00 | 217.00 | 122.00 | ||||
796 Tribal Area Sub Plan
(Minor Head) OffGrid/Distributed and Decentralized Renewable power(Sub Head |
|||||||
Solar power-GIA | 2.00 | 2.00 | 2.00 | 1.75 | |||
Solar Power-GCCA | 65.50 | 81.50 | 81.50 | 60.02 | |||
Biogas Programme-GCCA | 26.00 | 10.00 | 10.00 | 4.40 | |||
GRID Interactive Renewable power(hydro power)-subsidy | 60.00 | 60.00 | 60.00 | 60.00 | |||
Solar power-GIA | 1.50 | 1.50 | 1.50 | 0.00 | |||
Solar power-GCCA | 62.00 | 62.00 | 62.00 | 62.01 | |||
217.00 | 217.00 | 0.00 | 217.00 | 188.18 | |||
434.00 | 434.00 | 0.00 | 434.00 | 310.18 | |||
6 | 190-
Investment in Public Sector and Other Undertakings |
Solar Energy Corporation of India – Investments | 0.00 | ||||
Office Building | 40.40 | 40.40 | 40.40 | 17.39 | |||
40.40 | 40.40 | 0.00 | 40.40 | 17.39 | |||
GRAND TOTAL (PLAN) | 5106.6 | 5104.6 | -0.9 | 5103.7 | 4438.6 | ||
Deduct Recovery | |||||||
Net Plan | 5106.6 | 5104.6 | -0.9 | 5103.7 | 4438.6 | ||
7 | Secretariat
(NONPLAN) |
Eco Services (NON-PLAN) | 40.03 | 42.06 | 0.85 | 42.91 | 37.60 |
GRAND TOTAL | 5146.63 | 5146.63 | 0.00 | 5146.63 | 4476.20 |
Annexure-III
‘Renewable Energy Projects’
Details of studies conducted with foreign assistance by National Institute of Wind Energy(NIWE)
- NIWE has conducted offshore wind resource assessment at Gulf of Khambhat off Gujarat Coast as knowledge partner of the FOWIND Consortium led by Global Wind Energy Council (GWEC) funded by European Union. The LiDAR equipment was supplied by C-STEP (consortium partner) and the monopile structure was funded by Govt. of India. The project was commissioned during November 2017 and one year measurements have been completed and second year measurements are underway. This will facilitate the offshore wind energy development in the country.
- Collaboration project under Indo German Energy Programme- Green Energy Corridors project was under taken by NIWE for developing indigenous solar power forecasting models since April, 2017. This project was undertaken with technical assistance from GIZ, Germany with technical partners consisting of Overspeed GmbH, University of Oldenburg, Suntrace GmbH and M/s SGS weather and environmental systems, New Delhi. Under this project, an indigenous solar power forecasting model for India is developed and the models are in the process of validation. NIWE has set up Centre of Excellence for Variable Generation Forecasting and theses models are under validation and expected to set up operational solar power forecasting system soon.